OUR MAJOR EXPERIENCES
GT 2.2 PLTGU Grati Relay Protection & Relay Synchron Upgrade, Grati, East Java
Year: 2024
System: Protection Relay & Synchron Relay
Supply: Upgrade Siprotec 3 to Siprotec 5, upgrade Lockout Relay, rewiring, reprogramming, function test, and as built drawing
Troubleshooting Micom P343 Program, AGPF-JGC, Akatara Project, Jambi, West Sumatera
Year: 2024
System: Schneider Micom P343
Supply: Troubleshooting Program and setting File, Re-test when running
Redundant Fan Tanjung Uncang, Siemens, Batam, Kepulauan Riau
Year: 2024
System: Siemens
Supply: Pulling cable control, Insullation Test Cable, Installing Cable.
Precom UCP GEG AGPF, Akatara Project-JGC, Jambi, West Sumatera
Year: 2024
System: Schneider, DEIF, DSE
Supply: Precom Micom P343 Schneider Relay, DEIF Relay, and Deep Sea Electronic Relay
Retrofit Protection Relay, PT. Indonesia Power UP Grati
Year: 2024
System: Protection Relay
Supply: Upgrade Siprotec 3 to Siprotec 4, rewiring, reprogramming, function test, and as built drawing
Site Service Medco Grissik Site Suban (Anti Surge) Project, Jambi
Year: 2023
System: Siemens Master Pressure Control Panel
Supply: Repair Master Pressure Control Panel, Install New CP, Pulling Cable & termination, loop test, assist commissioning
GT 2.3 PLTGU Grati Relay Protection Upgrade, Grati, East Java
Year: 2023 (Ongoing)
System: Siemens Protection Relay
Supply: Replace components & wiring of Siprotec 3 to Siprotec 5 (Generator & SS Trafo Protection Relay), Programming & test function Siprotec 5 (4x 7UM85, 1x 7XT7100, 1x 7XT33, 1x 7XT34, & 1x 7UT85), Training Onsite, Trouble Shooting
Site Service ST2 & GCP2 Migration, Linde Gresik Project, Gresik, East Java
Year: 2023
System: Siemens T3000
Supply: Dismantle old panel & Setting new Panel ST2 & GCP2, Pulling Cable & termination, Conduit installation, loop test, assist commissioning, Network switch & Routing Configuration
Commissioning & Assistance Commissioning Service, P79/SAIPEM project, Batam
Year: 2023 – 2024
System: GE LV & MV Switchgear & MCC, Transformer, UPS
Supply: Supervise panel LV & MV panel Installation, Busbar IR & CR Test, Panel & Trafo CT/VT Test, Trafo Ratio & Winding Resistance Test, ACB & VCB Test, Relay Protection & Function Test, ATS & MTS Test
Commissioning Service, Mero 3 Project, Yantai, China
Year: 2023 – 2024
System: Siemens ICMS, LV & MV Switchgear & MCC
Supply: Supervise panel LV & MV panel Installation, Busbar IR & CR Test, Panel & Trafo CT/VT Test, Trafo Ratio & Winding Resistance Test, ACB & VCB Test, Relay Protection & Function Test, ATS & MTS Test
GE Protection Relay Function Test, Chevron HGPI CT#3 & MO CT#2 North Duri Cogen, Duri-Riau
Year: 2023
System: GE Protection Relay
Supply: Electrical inspection, protection relay function test and verification
Site Service 150kV AS Cabinet Smelting Project, Gresik, East Java
Year: 2023
System: Siemens T3000
Supply: Pulling Cable & termination, Conduit installation, loop test, assist commissioning
Retrofit Protection Relay, PT. Indonesia Power UP Grati
Year: 2022
System: Protection Relay
Supply: Upgrade Siprotec 3 to Siprotec 4, rewiring, reprogramming, function test, and as built drawing
Precomm & Commissioning, LNG Canada – Siemens Energy Pte Ltd Singapore Project, Batam, Kepulauan Riau
Year: 2021 – 2022
System: ABB LV Switchboard MNS-MCC, Siemens GM-SG Switchgear, Simovac MV MCC
Supply: Supervise panel LV & MV panel Installation, Busbar IR & CR Test, Panel & Trafo CT/VT Test, Trafo Ratio & Winding Resistance Test, ACB & VCB Test, Relay Protection & Function Test, ATS & MTS Test
Protection Relay Testing, Generator Minor Inspection Project, Asahimas Cilegon, Banten
Year: 2022
System: Siemens Protection Relay
Supply: Siprotec relay 7UM85 testing
Site Installation & Commissioning, PLTGU Senipah Project, Balikpapan
Year: 2022
System: Siemens T3000
Supply: Replace cable LAN, LAN Switches, & Simatic Module, assist commissioning
Site Installation & Commissioning, Pertamina Dumai Project, Riau
Year: 2022
System: Siemens Turbine
Supply: Dismantling old panel & reinstall new panel, termination, Continuity test, assist commissioning
Commissioning, Jangkrik FPU Merakes Project, East Kalimantan
Year: 2021
System: Siemens PLC
Supply: Modification PLC program, Communication Test PLC to LV MCC Panels
Site Installation, IKPP Project, Serang, Banten
Year: 2021
System: Siemens LV MCC panel, GIS, Transformer, UPS, & Battery Charger
Supply: LVMCC, GIS, Transformer, UPS, Battery Charger Installation
Site Installation & Commissioning, Linde Gresik Project, East Java
Year: 2020-2021
System: Siemens Turbine, Generator, & Gas Process Control Panels
Supply: Setting Panel, Pulling Cable & termination, Conduit installation, loop test, assist commissioning
Panel Fabricaton, Linde Gresik Project, Gresik, East Java
Year: 2020
System: Siemens Turbine, Generator, & Gas Process Control Panels
Supply: Fabrication & Wiring Turbine, Generator, & Gas Process Control Panels
SSCC System Upgrade Project, PLTU Paiton Unit 5 & 6, Paiton East Java
Year: 2019
System: PLC
Supply: 2 unit PLC Cabinet for SSCC System, site service installation, SSCC panel and termination replacement, Support loop check and commissioning of SSCC System
GE Protection Relay Function Test, Chevron HGPI CT#3 & MO CT#2 North Duri Cogen, Riau
Year: 2019
System: GE Protection Relay
Supply: Electrical inspection, protection relay function test and verification
Installation & Commissioning of CVT 150kV, PLTGU Tanjung Uncang, Batam
Year: 2018
System: 150kV Protection
Supply: Pulling cable control, install CVT 150kV, Testing CVT 150kV
Terminal Automation System & Terminal Mgmt System Oil Fuel Terminal - PT. Pertamina, Tegal Baru
Year: 2018
System: PLC & HMI
Supply: Terminal Management System (TMS) Application Software and Panels Fabrication.
Site Service of Soot Blower Panel Unit 50 Coal-Fired Power Plant 2x610 MW Project Paiton Unit 5 & 6
Year: 2018
System: PLC
Supply: Replace ABB PLC Cabinet with Siemens PLC Cabinet, Installation Control Cables, Wiring Modification of TDV & Gas Air Heater Boxes and Loop Check
Retrofit Protection Relay, PT. Indonesia Power Unit Pembangkit Grati, Pasuruan, East Java
Year: 2017 – Current
System: Protection Relay
Supply: Upgrade Siprotec 3 to Siprotec 4, rewiring, reprogramming, function test, and asbuilt drawing
Distributed Control System Migration Combine Cycle Power Plant at PLTU Paiton Unit 60
Year: 2017
System: DCS
Supply: Ethernet and control cabling system, Installation server cabinet, thin client and accessories of Siemens SPPA T3000, Installation wireless GPS Antenna, Modification of PLC panel wiring, Replacement of PLC Racks & Modules
Jangkrik Project – SAIPEM, Batam
Year: 2016
System: LV & MV Switchgear and MV Drive
Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear, Motor relay MV Drive.
EXXON Project – Co Gen, Singapore
Year: 2016
System: LV & MV Switchgear
Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear
Start Up Synchron GT1 & GT2 PLTGU Tj.Uncang - PT. Pembangunan Perumahan
Year: 2016-2018
System: LV & MV Switchgear & Scada System
Supply: Function test & protection test ABB REG650 and Siemens Siprotec 7UM. Stability test & load test for GT1 & GT2. Troubleshooting REG650 wiring and programming. Contiuinity CT/VT from switchyard to relay protection. Synchronitation multiple scada system with Tekron NTO1 GPS Clock.
Pertamina EP – Sulawesi
(Matindok) LNG
Year: 2017
System: PLC & SCADA System
Supply: Realization & programming for error reporting management betwen scada server, Performing Function test on IFAT
Jangkrik Project – SAIPEM, Batam
Year: 2016
System: LV & MV Switchgear and MV Drive
Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear, Motor relay MV Drive.
EXXON Project – Co Gen, Singapore
Year: 2016
System: LV & MV Switchgear
Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear
PLTGU Gunung Megang, PT Sewatama, Muara Enim
Year: 2016
System: Protection Relay
Supply: Re-programming of SIPROTEC 7UT613 and trouble shooting of VCB 6.6kV.
Yamal LNG, Yamgaz china BOMESC Shipyard - Tianjin
Year: 2016
System: LV switchgear & SCADA System
Supply: Realization & programming protection relay for LV switchgear, function test & protection test LV MCC – SIPROTEC IV, energizing PDCS server panel
Yamal LNG Project, Siemens Anshan, China
Year: 2015 – 2016
System: LV & MV switchgear
Supply: Realization & programming protection relay for LV & MV switchgear, realization & programming Simocode Pro, performing function test & protection test on FAT & IFAT
Upper Zakum 750 Project, Siemens Singapore - Batam
Year: 2015-2016
System: LV Switchgear
Supply: Design drawing review, check, and correction, Supervise electrical installation, Modification LV Switchgear, Realization & programming protection relay for LV MCC(Siprotec IV & Simocode Pro VPN), Commissioning protection relay & LV MCC, Marked up drawing and produce as built
Petrobras P76 Project, Siemens Singapore - Batam
Year: 2015
System: LV & MV Switchgear
Supply: Realization & programming protection relay for LV & LV Switchgear – Siprotec IV, Performing Function test & protection test on IFAT
Yamal LNG Project, Siemens Turkey
Year: 2015 – 2016
System: MV switchgear
Supply: Realization & programming protection relay for MV – Siprotec IV & V, performing function test & protection test on FAT & IFAT
Hot Gas Path Inspection at North Duri Co-Gen Power Plant Chevron- Duri
Year: 2015
System: Turbine Instrumentation
Supply: Dismantle & Install turbine electrical and instrumentation for turbine & generator inspection
PLC Tunnel Oven Line at PT. KYC (Karya Yasantara Cakti) ESAB, Karawang
Year: 2015
System: automation System
Supply: Installation, programming and training of Mistubhisi PLC
PT. Mandau Cipta Tenaga Nusantara, Duri – Co-Generation Power Plant
Year: 2014
System: Instrumentation
Supply: Calibration and re-setting of Ultrasonic Level field Transmitter.
PLC Upgrading Project at PT. Amerta Indah Otsuka Sukabumi (Pocari Sweat)
Year: 2014
System: PLC System
Supply: Installation, programming and training of Beckhoff PLC
Yamal LNG Project for Sabetta, Rusia, Siemens Singapore & Batam yard
Year: 2014-2017
System: HVAC, Fire Alarm System, LV & MV Switchgear and Scada System
Supply: Design drawing review, check, and correction, Supervise electrical installation, Modif. of LV & MV Switchgear , and HV control panel, Realization & Programming prot. relay for LV, MV, and HV – Siprotec IV & V, LV MCC and Simocode, Perform test on FAT & IFAT (FNG, Siprotec IV & V, Simocode & PCS7), Mark-up drawing and produce as built
Ball Cleaning Unit 1&2 of Steam Power Plant at PLTU Indramayu
Year: 2014
System: PLC & HMI Ball Cleaning
Supply: Design & Fabricate Ball Cleaning Control Panel unit 1&2, installation and commissioning ball cleaning control panel, programming and commissioning of Schneider PLC M340, programming and commissioning of Schneider HMI GT03510.
DCS (Distributed Control System) Migration of Combine Cycle Power Plant at PLTU Paiton Unit 50
Year: 2014
System: DCS
Supply: Ethernet and control cabling system, Installation server cabinet, thin client, & accessories of Siemens SPPA T3000, Installation wireless GPS Antenna, Modification of PLC panel wiring, Replacement of PLC Racks & Modules
Interconnection system of ship unloader to coal conveyor at PT.Krakatau Bandar Samudera
Year: 2014
System: PLC to PLC Communication
Supply: Fiber optic cabling system installation & testing, program modification on Siemens PLC and SCADA system, commissioning and performance test.
PT.Krakatau Daya Listrik - Cilegon
Year: 2014
System: Siemens MV Drive Switchgear
Supply: Commissioning Siprotec and MV Drive ROBICON.
Retrofit servo Drive & Motor – Extruder HSW PT. Indolakto
Year: 2014
System: Motion Control System
Supply: Engineering renew wiring, wiring component, upgrade & commissioning of motion control system of ice cream Factory
MV Protection Relay Service, Glad Stone LNG (GLNG) Plant, Australia
Year: 2014
System: Electrical
Supply: Update relay configuration & setting parameter Siprotec (MV relays) for Train 1 & Train 2, Testing of all Siprotec Relays for Train 1 & Train 2
Retrofit Drive Stand#4 & Cooling Bed Stand at PT. Interworld Steel Mill
Year: 2014
System: DC Drive system
Supply: Engineering & modification of internal wiring of drive panels, upgrading obsolete DC Drive to siemens DC Drive unit, load test and performance test.
MV Protection Relay Service, Glad Stone LNG Plant, Australia
Year: 2014
System: Electrical
Supply: Update configuration & setting parameter Siprotec (MV relays) for Train 1 & Train 2, Testing of all Siprotec Relays for Train 1 & Train 2
Residu Fluid Catalytic Cracking PT Kaltim Prima Coal, Kaltim
Year: 2014
System: MV Switchgear
Supply: Setting parameter & testing Siemens MV protection relays 20 kV & 70 kV
Recovery P10 Cement Plant at PT Indocement Cibinong, West Java
Year: 2014
System: Electrical & Instrumentation
Supply: Cable Management for electrical & Instrumentation system, Installation, Testing and Commissioning of LV Panels
Steam Power Plant Operating & Maintenance at PLTU Seputih, PT Sewatama, Lampung
Year: 2014
System: Electrical & Instrumentation of Boiler
Supply: Function test and trouble shooting electrical & instrumentation system
Maintenance for calibration field instrument and control system PT Firmenich Aromatic
Year: 2014 – 2015
System: Instrumentation & Automation
Supply: Weekly calibration Endress Hauser field instrument & control system, Modification & Re- programming of Siemens PLC & Scada System, Troubleshooting & on call service
Banyu Urip Project EPC2 Onshore Export Pipeline System, Mobil Cepu Limited, Cepu – Oil & Gas Industry
Year: 2014
System: Electrical Heat Tracing Panel
Supply: Pre commissioning of electrical heat tracing panels and As built drawing
Retrofit RTGC (Rubber Tyre Gantry Crane) at PT Jakarta International Container Terminal
Year: 2013 – 2014
System: Festoon Cabling System, Yaskawa PLC and Drive Unit
Supply: Dismantling, Installation & Testing of Festoon cable for 15 (fifteen) units of Gantry Crane), Installation and Commissioning of 8 (eight) units of Gantry Crane’s Hybrid System, Retrofitting of PLC system for new 10 (ten) units of Cabin Crane
Maintenance GENO Drajat, Chevron Garut
Year: 2013
System: Turbine & Generator
Supply: Electrical Supervisor & Technicians
PLTU Paiton U50-U60 Electrical upgrade at PLTGU Paiton Steam Turbine Power Plant 2 x 600 MW
Year: 2013 – 2014
System: Siemens Generator Protection Relay
Supply: Upgrade & testing Synchronize Relays, Upgrade & testing Protection Relays (Siprotec 4), Dismantle & Install AVR panel (Upgrade)
Pembangunan Line Conveyor Dermaga VI di Area TUKS PT Krakatau Bandar Samudera
Year: 2013-2014
System: PLC, HMI, AC Drive and Safety Devices
Supply: Engineering, Installation, & Commissioning of Coal Conveyor Control system 1,8 Km length.
Prefabricated Power House and Electrical Equipment, Gladstone LNG Plant Australia
Year: 2012-2013
System: LV & MV Switchgear
Supply: Cable Schedule & As-built Drawing, Pre-comm & Comm LV MCC Panel.