OUR MAJOR EXPERIENCES

GT 2.2 PLTGU Grati Relay Protection & Relay Synchron Upgrade, Grati, East Java ​

Year: 2024    

System: Protection  Relay & Synchron Relay

Supply: Upgrade Siprotec 3 to Siprotec  5, upgrade Lockout Relay, rewiring, reprogramming, function test, and as built drawing

Troubleshooting Micom P343 Program, AGPF-JGC, Akatara Project, Jambi, West Sumatera

Year: 2024

System: Schneider Micom P343

Supply: Troubleshooting Program and setting File, Re-test when running

Redundant Fan Tanjung Uncang, Siemens, Batam, Kepulauan Riau

Year: 2024       

System: Siemens

Supply: Pulling cable control, Insullation Test Cable, Installing Cable.

Precom UCP GEG AGPF, Akatara Project-JGC, Jambi, West Sumatera

Year: 2024

System: Schneider, DEIF, DSE

Supply: Precom Micom P343 Schneider Relay, DEIF Relay, and Deep Sea Electronic Relay

Retrofit Protection Relay, PT. Indonesia Power UP Grati ​

Year: 2024    

System: Protection  Relay

Supply: Upgrade Siprotec 3 to Siprotec  4, rewiring, reprogramming, function test, and as built drawing

Site Service Medco Grissik Site Suban (Anti Surge) Project, Jambi

Year: 2023        

System: Siemens  Master Pressure Control Panel

Supply: Repair Master Pressure Control Panel, Install New CP, Pulling Cable & termination, loop test, assist commissioning

GT 2.3 PLTGU Grati Relay Protection Upgrade, Grati, East Java ​

Year: 2023 (Ongoing)         

System: Siemens Protection  Relay

Supply: Replace components & wiring of Siprotec 3 to Siprotec 5 (Generator & SS Trafo Protection Relay), Programming & test function Siprotec 5 (4x 7UM85, 1x 7XT7100, 1x 7XT33, 1x 7XT34, & 1x 7UT85), Training Onsite, Trouble Shooting

Site Service ST2 & GCP2 Migration, Linde Gresik Project, Gresik, East Java

Year: 2023          

System: Siemens T3000

Supply: Dismantle old panel & Setting new Panel ST2 & GCP2, Pulling Cable & termination, Conduit installation, loop test, assist commissioning, Network switch & Routing Configuration

Commissioning & Assistance Commissioning Service, P79/SAIPEM project, Batam

Year: 2023 – 2024

System: GE LV & MV Switchgear & MCC, Transformer, UPS

Supply: Supervise panel LV & MV panel Installation, Busbar IR & CR Test, Panel & Trafo CT/VT Test, Trafo Ratio & Winding Resistance Test, ACB & VCB Test, Relay Protection & Function Test, ATS & MTS Test

Commissioning Service, Mero 3 Project, Yantai, China

Year: 2023 – 2024

System: Siemens ICMS, LV & MV Switchgear & MCC

Supply: Supervise panel LV & MV panel Installation, Busbar IR & CR Test, Panel & Trafo CT/VT Test, Trafo Ratio & Winding Resistance Test, ACB & VCB Test, Relay Protection & Function Test, ATS & MTS Test

GE Protection Relay Function Test, Chevron HGPI CT#3 & MO CT#2 North Duri Cogen, Duri-Riau

Year: 2023         

System: GE Protection  Relay

Supply: Electrical inspection, protection relay function test and verification

Site Service 150kV AS Cabinet Smelting Project, Gresik, East Java

Year: 2023          

System: Siemens T3000

Supply: Pulling Cable & termination, Conduit installation, loop test, assist commissioning

Retrofit Protection Relay, PT. Indonesia Power UP Grati

Year: 2022         

System: Protection  Relay

Supply: Upgrade Siprotec 3 to Siprotec  4, rewiring, reprogramming, function test, and as built drawing

Precomm & Commissioning, LNG Canada – Siemens Energy Pte Ltd Singapore Project, Batam, Kepulauan Riau

Year: 2021 – 2022

System: ABB LV Switchboard MNS-MCC, Siemens GM-SG Switchgear, Simovac MV MCC

Supply: Supervise panel LV & MV panel Installation, Busbar IR & CR Test, Panel & Trafo CT/VT Test, Trafo Ratio & Winding Resistance Test, ACB & VCB Test, Relay Protection & Function Test, ATS & MTS Test

Protection Relay Testing, Generator Minor Inspection Project, Asahimas Cilegon, Banten

Year: 2022         

System: Siemens Protection  Relay

Supply: Siprotec relay 7UM85 testing

Site Installation & Commissioning, PLTGU Senipah Project, Balikpapan

Year: 2022          

System: Siemens T3000

Supply: Replace cable LAN, LAN Switches, & Simatic Module, assist commissioning

Site Installation & Commissioning, Pertamina Dumai Project, Riau

Year: 2022          

System: Siemens Turbine

Supply: Dismantling old panel & reinstall new panel, termination, Continuity test, assist commissioning

Commissioning, Jangkrik FPU Merakes Project, East Kalimantan

Year: 2021          

System: Siemens PLC

Supply: Modification PLC program, Communication Test PLC to LV MCC Panels

Site Installation, IKPP Project, Serang, Banten

Year: 2021

System: Siemens LV MCC panel, GIS, Transformer, UPS, & Battery Charger

Supply: LVMCC, GIS, Transformer, UPS, Battery Charger Installation

Site Installation & Commissioning, Linde Gresik Project, East Java

Year: 2020-2021          

System: Siemens Turbine, Generator, & Gas Process Control Panels 

Supply: Setting Panel, Pulling Cable & termination, Conduit installation, loop test, assist commissioning

Panel Fabricaton, Linde Gresik Project, Gresik, East Java

Year: 2020

System: Siemens Turbine, Generator, & Gas Process Control Panels

Supply: Fabrication & Wiring Turbine, Generator, & Gas Process Control Panels

SSCC System Upgrade Project, PLTU Paiton Unit 5 & 6, Paiton East Java

Year: 2019

System: PLC

Supply: 2 unit PLC Cabinet for SSCC System, site service installation, SSCC panel and termination replacement, Support loop check and commissioning of SSCC System

GE Protection Relay Function Test, Chevron HGPI CT#3 & MO CT#2 North Duri Cogen, Riau

Year: 2019          

System: GE Protection  Relay

Supply: Electrical inspection, protection relay function test and verification

Installation & Commissioning of CVT 150kV, PLTGU Tanjung Uncang, Batam

Year: 2018

System: 150kV Protection

Supply: Pulling cable control, install CVT 150kV, Testing CVT 150kV

Terminal Automation System & Terminal Mgmt System Oil Fuel Terminal - PT. Pertamina, Tegal Baru

Year: 2018

System: PLC & HMI

Supply: Terminal Management System (TMS) Application Software and Panels Fabrication.

Site Service of Soot Blower Panel Unit 50 Coal-Fired Power Plant 2x610 MW Project Paiton Unit 5 & 6

Year: 2018

System: PLC

Supply: Replace ABB PLC Cabinet with Siemens PLC Cabinet, Installation Control Cables, Wiring Modification of TDV & Gas Air Heater Boxes and Loop Check

Retrofit Protection Relay, PT. Indonesia Power Unit Pembangkit Grati, Pasuruan, East Java

Year: 2017 – Current          

System: Protection  Relay

Supply: Upgrade Siprotec 3 to Siprotec  4, rewiring, reprogramming, function test, and asbuilt drawing

Distributed Control System Migration Combine Cycle Power Plant at PLTU Paiton Unit 60

Year: 2017

System: DCS

Supply: Ethernet and  control  cabling system, Installation  server  cabinet,  thin  client and  accessories of Siemens SPPA  T3000, Installation wireless GPS Antenna, Modification of PLC panel  wiring, Replacement of PLC Racks & Modules

Jangkrik Project – SAIPEM, Batam

Year: 2016

System: LV & MV Switchgear and MV Drive

Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear, Motor relay MV Drive.

EXXON Project – Co Gen, Singapore

Year: 2016

System: LV & MV Switchgear

Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear

Start Up Synchron GT1 & GT2 PLTGU Tj.Uncang - PT. Pembangunan Perumahan

Year: 2016-2018

System: LV & MV Switchgear & Scada System

Supply: Function test & protection test ABB REG650 and Siemens Siprotec 7UM. Stability test & load test for GT1 & GT2. Troubleshooting REG650 wiring and programming. Contiuinity CT/VT from  switchyard to relay protection. Synchronitation multiple scada system with Tekron NTO1 GPS Clock.

Pertamina EP – Sulawesi (Matindok) LNG

Year: 2017

System: PLC & SCADA System

Supply:  Realization & programming for error reporting management betwen scada server,  Performing Function  test  on IFAT

Jangkrik Project – SAIPEM, Batam

Year: 2016

System: LV & MV Switchgear and MV Drive

Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear, Motor relay MV Drive.

EXXON Project – Co Gen, Singapore

Year: 2016

System: LV & MV Switchgear

Supply: Function test & Siemens Siprotec Relay, Installation of LV& MV Panel Siemens Switchgear

PLTGU Gunung Megang, PT Sewatama, Muara Enim

Year: 2016

System: Protection Relay

Supply: Re-programming of SIPROTEC 7UT613 and  trouble shooting of VCB 6.6kV.

Yamal LNG, Yamgaz china BOMESC Shipyard - Tianjin

Year: 2016

System: LV switchgear & SCADA System

Supply: Realization & programming protection relay for LV switchgear, function test & protection test LV MCC – SIPROTEC IV, energizing PDCS server panel

Yamal LNG Project, Siemens Anshan, China

Year: 2015 – 2016

System: LV & MV switchgear

Supply: Realization & programming protection relay for LV & MV switchgear, realization & programming Simocode Pro, performing function test & protection test on FAT & IFAT

Upper Zakum 750 Project, Siemens Singapore - Batam

Year: 2015-2016

System: LV Switchgear

Supply:  Design  drawing review, check, and correction, Supervise electrical installation, Modification LV Switchgear, Realization & programming protection relay for LV MCC(Siprotec IV & Simocode Pro VPN),  Commissioning protection relay & LV MCC, Marked up drawing and produce as built

Petrobras P76 Project, Siemens Singapore - Batam

Year: 2015

System: LV & MV Switchgear

Supply: Realization  &  programming  protection relay  for  LV & LV Switchgear – Siprotec IV, Performing Function  test  & protection test on IFAT

Yamal LNG Project, Siemens Turkey

Year: 2015 – 2016

System: MV switchgear

Supply: Realization & programming protection relay for MV – Siprotec IV & V, performing function test & protection test on FAT & IFAT

Hot Gas Path Inspection at North Duri Co-Gen Power Plant Chevron- Duri

Year: 2015

System: Turbine Instrumentation

Supply: Dismantle & Install turbine electrical and instrumentation for turbine & generator inspection

PLC Tunnel Oven Line at PT. KYC (Karya Yasantara Cakti) ESAB, Karawang

Year: 2015

System: automation System

Supply: Installation, programming and training of Mistubhisi PLC

PT. Mandau Cipta Tenaga Nusantara, Duri – Co-Generation Power Plant

Year: 2014

System:  Instrumentation

Supply: Calibration and re-setting of Ultrasonic Level  field Transmitter.

PLC Upgrading Project at PT. Amerta Indah Otsuka Sukabumi (Pocari Sweat)

Year: 2014

System: PLC System

Supply: Installation, programming and training of Beckhoff PLC

Yamal LNG Project for Sabetta, Rusia, Siemens Singapore & Batam yard

Year: 2014-2017

System: HVAC, Fire Alarm System, LV & MV Switchgear and Scada System

Supply: Design  drawing review, check, and correction, Supervise electrical installation, Modif. of LV & MV Switchgear , and HV control panel, Realization & Programming prot. relay for LV, MV, and HV –  Siprotec IV & V, LV MCC and  Simocode, Perform test  on FAT & IFAT (FNG, Siprotec IV & V, Simocode & PCS7), Mark-up drawing and produce as built

Ball Cleaning Unit 1&2 of Steam Power Plant at PLTU Indramayu

Year: 2014

System: PLC & HMI Ball Cleaning

Supply: Design & Fabricate  Ball Cleaning Control Panel unit 1&2, installation and commissioning ball cleaning control panel, programming and commissioning of Schneider PLC M340, programming and commissioning of Schneider HMI GT03510.

DCS (Distributed Control System) Migration of Combine Cycle Power Plant at PLTU Paiton Unit 50

Year: 2014

System: DCS

Supply: Ethernet and  control  cabling system, Installation  server  cabinet,  thin  client,  & accessories of Siemens SPPA  T3000, Installation wireless GPS Antenna, Modification of PLC panel  wiring, Replacement of PLC Racks & Modules

Interconnection system of ship unloader to coal conveyor at PT.Krakatau Bandar Samudera

Year: 2014

System: PLC to PLC Communication

Supply: Fiber optic cabling system installation & testing, program modification on Siemens PLC and  SCADA system, commissioning and performance test.

PT.Krakatau Daya Listrik - Cilegon

Year: 2014

System: Siemens MV Drive Switchgear

Supply: Commissioning Siprotec and MV Drive ROBICON.

Retrofit servo Drive & Motor – Extruder HSW PT. Indolakto

Year: 2014

System: Motion Control System

Supply: Engineering renew wiring, wiring component, upgrade & commissioning of motion control system of ice cream Factory

MV Protection Relay Service, Glad Stone LNG (GLNG) Plant, Australia

Year: 2014

System: Electrical

Supply: Update relay configuration & setting parameter Siprotec (MV relays) for Train 1 & Train 2, Testing of all Siprotec Relays for Train 1 & Train 2

Retrofit Drive Stand#4 & Cooling Bed Stand at PT. Interworld Steel Mill

Year: 2014

System: DC Drive  system

Supply: Engineering & modification of internal wiring of drive panels, upgrading obsolete DC Drive to siemens DC Drive unit, load test and performance test.

MV Protection Relay Service, Glad Stone LNG Plant, Australia

Year: 2014

System: Electrical

Supply: Update configuration & setting parameter Siprotec (MV relays) for Train 1 & Train 2, Testing of all Siprotec Relays for Train 1 & Train 2

Residu Fluid Catalytic Cracking PT Kaltim Prima Coal, Kaltim

Year: 2014

System: MV Switchgear

Supply: Setting parameter  &  testing  Siemens  MV protection relays 20 kV & 70 kV

Recovery P10 Cement Plant at PT Indocement Cibinong, West Java

Year: 2014

System: Electrical & Instrumentation

Supply: Cable Management for electrical & Instrumentation  system,  Installation,  Testing and Commissioning of LV Panels

Steam Power Plant Operating & Maintenance at PLTU Seputih, PT Sewatama, Lampung

Year: 2014

System:   Electrical   &  Instrumentation  of   Boiler

Supply:    Function    test    and    trouble   shooting electrical & instrumentation system

Maintenance for calibration field instrument and control system PT Firmenich Aromatic

Year: 2014 – 2015

System: Instrumentation & Automation

Supply: Weekly  calibration  Endress  Hauser field instrument  & control   system,  Modification  & Re- programming of Siemens PLC & Scada System, Troubleshooting & on call service

Banyu Urip Project EPC2 Onshore Export Pipeline System, Mobil Cepu Limited, Cepu – Oil & Gas Industry

Year: 2014

System: Electrical Heat  Tracing Panel

Supply: Pre commissioning of electrical heat  tracing panels and As built drawing

Retrofit RTGC (Rubber Tyre Gantry Crane) at PT Jakarta International Container Terminal

Year: 2013 – 2014

System: Festoon Cabling System, Yaskawa PLC  and Drive Unit

Supply: Dismantling,  Installation & Testing  of Festoon cable for 15 (fifteen) units of Gantry Crane), Installation and Commissioning of  8  (eight)  units of Gantry Crane’s  Hybrid System, Retrofitting of PLC system for new  10 (ten) units of Cabin Crane

Maintenance GENO Drajat, Chevron Garut


Year: 2013

System: Turbine & Generator

Supply: Electrical Supervisor & Technicians

PLTU Paiton U50-U60 Electrical upgrade at PLTGU Paiton Steam Turbine Power Plant 2 x 600 MW

Year: 2013 – 2014

System: Siemens Generator Protection Relay

Supply: Upgrade  & testing  Synchronize Relays, Upgrade & testing Protection Relays (Siprotec 4), Dismantle & Install AVR panel  (Upgrade)

Pembangunan Line Conveyor Dermaga VI di Area TUKS PT Krakatau Bandar Samudera

Year: 2013-2014

System: PLC, HMI, AC Drive and Safety  Devices

Supply: Engineering, Installation, & Commissioning of Coal Conveyor  Control system 1,8 Km length.

Prefabricated Power House and Electrical Equipment, Gladstone LNG Plant Australia

Year: 2012-2013

System: LV & MV Switchgear

Supply: Cable Schedule & As-built Drawing, Pre-comm & Comm LV MCC Panel.